1. H. Ahuja, Construction Performance Control by Networks, Wiley, New York, 1976.
2. J.M. Antill, and R.W. Woodhead, Critical Path Methods in Construction Practice, 3rd edn., Wiley, New York, 1982.
3. Construction resource scheduling with genetic algorithms;Chan;Journal of Construction Engineering and Management, ASCE,1996
4. Resource leveling in construction by optimization;Easa;Journal of Construction Engineering and Management, ASCE,1989
5. Using genetic algorithms to solve construction time-cost tradeoff problems;Feng;Journal of Construction Engineering and Management, ASCE,1997