Author:
Son Pham Vu Hong,Nguyenduc Congminh
Publisher
Springer Science and Business Media LLC
Reference45 articles.
1. Arditi, D., & Pattanakitchamroon, T. (2006). Selecting a delay analysis method in resolving construction claims. International Journal of Project Management, 24(2), 145–155.
2. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357.
3. Cheng, M., Chiu, C., Chiu, Y., Wu, Y., Syu, Z., Prayogo, D., & Lin, C. (2014). SOS optimization model for bridge life cycle risk evaluation and maintenance strategies. Journal of the Chinese Institute of Civil and Hydraulic Engineering, 26(4), 293–308.
4. Cheng, M.-Y., Prayogo, D., & Tran, D.-H. (2016a). Optimizing multiple-resources leveling in multiple projects using discrete symbiotic organisms search. Journal of Computing in Civil Engineering, 30(3), 04015036.
5. Cheng, M.-Y., Prayogo, D., Wu, Y.-W., & Lukito, M. M. (2016b). A Hybrid Harmony Search algorithm for discrete sizing optimization of truss structure. Automation in Construction, 69, 21–33.