Author:
El-Bouri Ahmed,Balakrishnan Subramaniam,Popplewell Neil
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference25 articles.
1. Scheduling for minimizing total actual flow time by neural networks;Arizono;International Journal of Production Research,1992
2. Introduction to Sequencing and Scheduling;Baker,1974
3. C. Dagli, R. Huggahalli, A neural network architecture for faster dynamic scheduling in manufacturing systems, in: Proceedings of the 1991 IEEE International Conference on Robotics and Automation, Sacramento, CA, April 1991, pp. 2408–2413
4. Minimizing total tardiness on one machine is NP-hard;Du;Mathematics of Operations Research,1990
5. One machine sequencing to minimize certain functions of job tardiness;Emmons;Operations Research,1969
Cited by
29 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献