1. Minimizing passenger travel time in URT system adopting skip-stop strategy;Abdelhafiez;J. Rail Transp. Plan. Manag.,2017
2. Rescheduling through stop-skipping in dense railway systems;Altazin;Transp. Res. C,2017
3. Synchronization and Linearity: An Algebra for Discrete Event Systems,1992
4. Robust optimization models for integrated train stop planning and timetabling with passenger demand uncertainty;Cacchiani;Transp. Res. B,2020
5. Robust and optimized urban rail timetabling using a marshaling plan and skip-stop operation;Cao;Transportmetrica A,2020