1. Asplund, E., Danielson, U., 1991. Räta ut Byggsvängen (Straightening the Building Roundabout). SBUF, Stockholm.
2. Shielding production: essential step in production control;Ballard;Journal of Construction Engineering and Management,1998
3. Supply chain management;Bechtel;International Journal of Logistics Management,1997
4. Bennett, J., Pothecary, E., Robinson, G., 1996. Designing and Building a World-Class Industry, University of Reading.
5. Bobroff, J., Campagnac, E., 1987. La Démarche Séquentielle de la SGE-BTP (The Sequential Procedure of SGE-BTP). Plan Construction, Paris.