1. Production Planning by Mixed Integer Programming;Pochet,2010
2. T. Wu, K. Akartunali, J. Song, L. Shi, Mixed integer programming in production planning with backlogging and setup carryover: Modeling and algorithms, DEDS.
3. Scheduling in supply chains using mixed integer programming;Sawik,2011
4. A.B. Keha, K. Khowala, J.W. Fowler, Mixed integer programming formulations for single machine scheduling problems, Comput. Ind. Eng.
5. C. Malandraki, M. Daskin, Time dependent vehicle routing problems: Formulations, properties and heuristic algorithms, Transp. Sci.