1. Use of in situ tests for foundation design on clay;Aas,1986
2. Foundation Analysis and Design;Bowles,1996
3. Fowler, J., Edris, E.V. Jr., Hanks, W.L., Holloway, T.S., 1987. Perimeter dike stability analyses Craney Island Disposal Area, Norfolk District, Norfolk, VA. Miscellaneous Paper GL-97-4, U.S. Army Engineers, Waterways Experiment Station, Corps of Engineers, Vicksburg, MS.
4. Ishibashi, I., 1995. Geotechnical engineering support for Craney Island project: phase III: stability analysis for new levee construction, Volume I. Report on Contract No. DACW65-94-M-0234, U.S. Army Corps of Engineers, Norfolk District, Norfolk, VA.
5. Ishibashi, I., Choi, J.W., 1994. Geotechnical engineering support for Craney Island project: phase II: laboratory determination of soil properties and levee stability analysis. Report on Contract No. DACW65-93-M-0390, U.S. Army Corps of Engineers, Norfolk District, Norfolk, VA.