1. CO2 capture from power plants: part I. A parametric study of the technical performance based on monoethanolamine;Abu-Zahra;International Journal of Greenhouse Gas Control,2007
2. BIGCO2, 2011. CO2 Management Technologies for Future Power Generation, project duration from 2007 to 2011. http://www.bigco2.com.
3. CASTOR, 2008. EU-Project, CO2 from Capture to Storage (CASTOR): Integrated Research Project Partially Funded by the European Commission Under the 6th Frame Work Program, Contract Number SES6-CT-2004-502586, Project Duration from 01.02.2004 to 31.01.2008. http://www.co2castor.com.
4. CCP, 2013. CO2 Capture Project (CCP): CCP1, CCP2, and CCP3, Project Duration from 2000 to 2013. http://www.co2captureproject.org in
5. CESAR, 2011. EU-Project, CO2 Enhanced Separation and Recovery (CESAR): Integrated Research Project Partially Funded by the European Commission Under the 7th Frame Work Program, Grant Agreement Number 213569, Project Duration from 01.02.2008 to 31.01.2011. http://www.co2cesar.eu.