1. LHC Design Report Volume 1 “ The LHC Main Ring”, CERN, 2004, ISBN 92-9083-224-0, 〈http://lhc.web.cern.ch/lhc/LHC-DesignReport.html〉 (2012-08-31)
2. Bertinelli F, Catalan Lasheras N, Fessia P, Garion C, Mathot S, Perin A, et al. Towards a consolidation of LHC superconducting splices for 7Te/V operation. In: Proc. 1st Int. particle accelerator conf. (IPAC'10), Kjoto, Japan, 2010, 〈http://accelconf.web.cern.ch/AccelConf/IPAC10/papers/mopeb042.pdf〉 (2012-08-31)
3. Production and quality assurance of main busbar interconnection splices during the LHC 2008–2009 shutdown;Bertinelli;IEEE Transactions on Applied Superconductivity,2011
4. Theory and practice of infrared technology for non-destructive testing;Maldague,2001
5. Aircraft composites assessment by means of transient thermal NDT;Avdelidis;Prog Aerosp Sci,2004