Author:
Ferradás Pablo Guzmán,Salonitis Konstantinos
Reference14 articles.
1. Goubergen, D.V., Landeghem, H.V., 2002. Rules for integrating fast changeover capabilities into new equipment design. Robotics and Computer Integrated Manufacturing 18, pp. 205-214.
2. Gest G., Culley, S.J., McIntosh, R.I., Mileham, A.R., Owen, G.W., 1995. Review of fast tool change systems. Computer Integrated Manufacturing Systems 8, pp. 205-210.
3. Coimbra, E.A., 2009. Total Flow Management: Achieving Excellence with Kaizen and Lean Supply Chains. Kaizen Institute.
4. Shingo, S., 1985. A revolution in manufacturing: The SMED system. Productivity Press, Stanford, CT.
5. McIntosh, R.I., Culley, S.J., Mileham, A.R., Owen, G.W., 2001. Changeover improvement: A maintenance perspective. International Journal of Production Economics 73, pp. 153-163.
Cited by
48 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献