Author:
Elhusseiny Hayssam O.,Nosair Ibrahim,Ezeldin A. Samer
Reference28 articles.
1. Arditi D, Pattanakitchamroon T. PROJECT Selecting a delay analysis method in resolving construction claims 2006;24:145–55. https://doi.org/10.1016/j.ijproman.2005.08.005.
2. Sweis G, Sweis R, Abu Hammad A, Shboul A. Delays in construction projects : The case of Jordan 2008;26:665–74. https://doi.org/10.1016/j.ijproman.2007.09.009.
3. Zaki A, Elalim AMA, Samadony AEL. Factors affecting schedule delay and cost overrun in Egyptian construction projects. Sustain. Constr. Proj. Manag. - Sustain. Infrastruct. Transp. Futur. cities, Aswan: 2018, p. 1–11.
4. El-razek MEA, Bassioni HA, Mobarak AM. Causes of delay in building construction projects in Egypt 2009;134:831–41.
5. Analyzing delay causes in Egyptian construction projects Analyzing delay causes in Egyptian construction projects;Marzouk;J Adv Res,2014
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献