Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
Author:
Publisher
Elsevier BV
Subject
General Engineering
Reference59 articles.
1. Factors causing rework and their impact on projects ’ performance in egypt;Al-janabi;J Civ Eng Manag,2020
2. Cost escalation and schedule delays in road construction projects in Zambia;Kaliba;Int J Proj Manag,2009
3. Causes, effects and methods of minimizing delays in construction projects kang sik wei universiti teknologi malaysia;Ks;Universiti Teknologi Malaysia,2010
4. Magdy M, Georgy M, Osman H, Elsaid M. Delay Analysis Methodologies Used by Engineering and Construction Firms in Egypt 2019;11. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000293.
Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Exploring the knowledge system in building information modeling (BIM) technology for medical construction projects (MCPS): A bibliometric analysis and prospective direction;Ain Shams Engineering Journal;2024-09
2. Effect of Construction Delays and the Preventive Role of Concrete Works Optimization: Systematic Literature Review;TEM Journal;2024-05-28
3. Revisión sistemática de la implementación BIM basada en modelos de diseño para la construcción de obras viales;Cuaderno activa;2023-05-30
4. Study the delays and conflicts for construction projects and their mutual relationship: A review;Ain Shams Engineering Journal;2023-02
5. The major problems between main contractors and subcontractors in construction projects in Egypt;Ain Shams Engineering Journal;2022-11
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3