1. Abrahamsen R. Mjøstårnet – 18 storey timber building completed. In: Proc. 24. internationales holzbau-forum. 2018.
2. Case study: an 18 storey tall mass timber hybrid student residence at the University of British Columbia, Vancouver;Fast,2016
3. SPIDER connector and PILLAR connector;ETA-19/0700,2020
4. Experimental analysis and structural modelling of the punching behaviour of continuous two-way CLT flat slabs;Muster;Eng Struct,2020
5. Tapia C, Stimpfle L, Aicher S. A scalable column-CLT-slab connection for open-plan high-rise timber buildings. In: Proceedings of the world conference on timber engineering. 2021.