1. Salegna Workload smoothing in a bottleneck job shop;Gary;International Journal of Productions and Operations Management MCB University Press,1996
2. Kenneth N, McKay Vincent, C.S. Wiers, 2004, Practical Production Control A Survival Guide for Planners and Schedulers, J. Ross Publishing, Inc.
3. Patrik Jonsson and Magnus Lesshammar, 1999, Evaluation an improvement of manufacturing performance measurement systems – the role of OEE, International Journal of Productions and Operations Management, MCB University Press, pp 55-78.
4. Overall Equipment Effectiveness: A Power full Production/Maintenance tool for Increased Profits;Robert,2001
5. Rong-Lei Sun, Han Ding, YoulunXiong and Runshen Du, 2006, Iterative Learning Scheduling: a combination of optimization and dispatching rules, Journal of Manufacturing Technology Management, pp. 298-305.