1. Ivković S.: Failures of Mining Machine Elements, University of Belgrade, Faculty of Mining and Geology, Belgrade, 1997;
2. Vujić S., Stanojević R., Tanasković T., Zajić B., Živojinović R., Maksimović S.: Methods for Optimization the Exploitation Life Time of Mining Machines, Faculty of Mining and Geology, Belgrade, Electric Power Industry of Serbia, Engineering Academy of Serbia and Montenegro, 2004 (in Serbian);
3. Polovina D.: Methodology for Determining The Remaining Possibilities of Rotary Excavators in Exploitation and Revitalization -Doctoral Dissertation, University of Belgrade, Faculty of Mining and Geology, Belgrade, 2010 (in Serbian);
4. Vukotić V., Čabrilo D.: Increasing the Reliability of Excavation Subsystem of a Rotary Excavator by Adjusting the Tribological Characteristics of Cutting Elements, 13th International Conference on Tribology Serbiatrib 13, 2013 (in Serbian);
5. Milovanović I., Dimitrijević Ž., Vučković B., Radovanović B., Bogdanović V., Stojanović S., Vučković M., Šubaranović T., Polomčić D., Božić M., Miletić D., Raščanin Z., Spasić A., Milovanović S., Kulić Z., Lukić V.: Additional Mining Project of The Open Pit "Drmno" for a Capacity of 12x10 6 tons of Coal Per Year, PE EPS Belgrade, Branch RB Kolubara, Organizational Unit "PROJECT" Lazarevac, May 2019 (in Serbian);