Affiliation:
1. Mining and Metallurgy Institute Bor, 19210 Bor, Serbia
2. Faculty of Mining and Geology Belgrade, University of Belgrade, 11120 Belgrade, Serbia
Abstract
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ECC system (bucket wheel excavator-conveyor-crushing plant) of the open pit Drmno-Kostolac, which operates within the Electric Power Company of Serbia. The advantage of a model of this type is that it does not rely on the historical experiences of experts and usual predicted values for the fuzzy evaluation of partial indicators, which are based on the assumption that similar systems affect availability in a similar way. The fuzzy evaluation of partial indicators is based on historical data for the specific system for which the model was created. As such, it can more accurately predict continuous systems availability on the basis of expert evaluations in the appropriate time period. Another advantage of this model is that the availability is estimated on a quarterly basis, which gives a more accurate view because it uses a smaller time period with more similar characteristics and, thus, includes certain external influences which are related to the quarterly meteorological conditions.
Funder
Ministry of Education, Science and Technological Development of the Republic of Serbia
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction
Reference19 articles.
1. Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit;Min. Metall. Eng. Bor,2020
2. Djenadic, S., Ignjatovic, D., Tanasijevic, M., Bugaric, U., Jankovic, I., and Subaranovic, T. (2019). Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine. Energies, 12.
3. Overview of application the Soft Computing methods in the field of mining in our country and in the world;Min. Met. Eng. Bor,2022
4. SVNN-ANFIS approach for stability evaluation of open-pit mine slopes;Qin;Expert Syst. Appl.,2022
5. Performance evaluation of hybrid FFA-ANFIS and GA-ANFIS models to predict particle size distribution of a muck-pile after blasting;Zhou;Eng. Comput.,2019