Lead time prediction for sheeter machine production in a paper conversion industry
-
Published:2022
Issue:4
Volume:20
Page:1009-1015
-
ISSN:1451-4117
-
Container-title:Journal of Applied Engineering Science
-
language:en
-
Short-container-title:J Appl Eng Science
Author:
Talha Siddique,Dawood Idrees,Jamil Atif,Ansari Arsalan,Sami Abdul,Rauf Muhammad
Abstract
Lead time is a critical performance measure in any manufacturing setting Key Performance Indicator (KPI). The same is true in the paper conversion industry, which has a significant degree of product variability. Due to the great variety of their products, all industries must be able to foresee and plan ahead in order to meet client demand. With contemporary research concentrating on machine learning and simulation techniques, businesses must implement a manufacturing execution system (MES) to track data. However, without such a framework, applying machine learning and simulation approaches becomes difficult. This study introduces a novel method for forecasting lead time (special to sheeter machines used in the paper conversion sector) by combining the time required to process the reel (sheeting time) with the human (setup) elements. The method used to calculate the sheeting time takes product parameters into account, allowing for product-specific lead time forecast. As a result, a very successful 'product-specific' lead time prediction approach for small scale enterprises has been developed that enables production planning without relying on current and data-intensive prediction methods such as machine learning and simulation.
Publisher
Centre for Evaluation in Education and Science (CEON/CEES)
Subject
Mechanical Engineering,General Engineering,Safety, Risk, Reliability and Quality,Transportation,Renewable Energy, Sustainability and the Environment,Civil and Structural Engineering
Reference11 articles.
1. Dey, S., Sharma, R. R. K., and Pandey, B. K. (2019). Relationship of Manufacturing Flexibility with Organizational Strategy. Global Journal of Flexible Systems Management, vol. 20, no. 3, pp. 237-256, DOI: 10.1007/s40171-019-00212-x; 2. Gyulai, D., Pfeiffer, A., Nick, G., Gallina, V., Sihn, W., & Monostori, L. (2018). Lead time prediction in a flowshop environment with analytical and machine learning approaches. IFAC-PapersOnLine, vol. 51, no. 11, pp. 1029-1034, DOI: 10.1016/j.ifacol.2018.08.472; 3. Zhu, H., and Woo, J. H. (2021). Hybrid NHPSO-JTVAC-SVM Model to Predict Production Lead Time. Applied Sciences, vol. 11, no. 14, p. 6369, DOI: 10.3390/app11146369; 4. Gherghea, I. C., Bungau, C., and Negrau, D. C. (2019, August). Lead time reduction and increasing productivity by implementing lean manufacturing methods in cnc processing center. In IOP Conference Series: Materials Science and Engineering, 2019, vol. 568, no. 1, p. 012014, DOI: 10.1088/1757-899X/568/1/012014; 5. Lang, S., Behrendt, F., Lanzerath, N., Reggelin, T., and Müller, M. (2020, December). Integration of deep reinforcement learning and discrete-event simulation for real-time scheduling of a flexible job shop production. Winter Simulation Conference (WSC), 2020, pp. 3057-3068. DOI: 10.1109/WSC48552.2020.9383997;
|
|