PLANNING CONSTRUCTION EXECUTION IN THE ENGINEERING PRE-CONSTRUCTION SYSTEM

Author:

Viliūnienė Odeta1,Inokaitytė Loreta1

Affiliation:

1. Kauno technologijos universitetas, Studentų g. 48, LT-51367 Kaunas, Lietuva

Abstract

The article analyzes an efficient method for planning the execution of construction work. Construction companies are looking for ways to reduce the essential factors in executing the construction work project, i.e. cost and time influencing the forthcoming company’s operating results are offered to perform engineering pre-construction activities. Engineering pre-construction is a set of technical, legal, economic, technological and organisational measures that shall ensure a consistent start of construction and a rhythmical organisation of major construction works employing optimum technology. Engineering pre-construction provides great potential for working out rational design solutions with respect to the execution of construction works applying a range of methods for assessing the aforesaid solutions. In this case, mathematical methods play the main role. Mathematical methods enable more effective tackling of the execution issues of construction works as well as developing rational design solutions with respect to the execution of construction works (Janušaitis, Juodis 2001; Juodis, Apanaviciene 2003; Viliuniene, Juodis 2002; Malinauskas, Kalibatas 2005; Viliūnienė, Viliūnas 2005; Viliuniene, Viliunas 2007; Žiogas, Juočiūnas 2005; Janusz, Kapliński 2006; Zavadskas et al. 2009; Šiškina et al. 2009; Medeliene, Ziogas 2010). Practical implementation of such solutions in the course of executing construction works would allow cutting down construction costs and construction time by 15–25% and 16–25% respectively (Viliūnienė, Viliūnas 2005). Besides, the rapid development of computer technology enables both faster preparation of rational design solutions to construction works through the application of mathematical methods and integration thereof into special software packages designed for construction management. Therefore, contractors should realise the significance of engineering pre-construction that is especially important to the execution of expensive large-scale projects. The process of construction execution should be improved applying the project management technique that helps to achieve the set goal within a limited time and with the optimum usage of limited resources. The objective of project management is to plan, organise and control project resources in order to implement the goals of the project. Hence, engineering pre-construction should be considered as an individual construction project stage acting as an engine for planning construction execution, organisation and control, thereby enabling a construction company to focus on profitable results. The article presents the methodology for preparing design solutions to the execution of construction work, which is adapted to handle the practical issues of engineering a pre-construction stage. The execution of complex earth works has been chosen as the subject matter of research.

Publisher

Vilnius Gediminas Technical University

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3