THE EFFECT OF CURRENT PUBLIC PROCUREMENT LAW ON DURATION AND COST OF CONSTRUCTION PROJECTS IN TURKEY

Author:

Erdis Ercan1

Affiliation:

1. Department of Civil Engineering, Engineering Faculty, Mustafa Kemal University, 31200 Iskenderun, Turkey

Abstract

The current public procurement law (Law No. 4734) was established in Turkey in 2003. The current law has fundamental differences from the previous one, Law No. 2886, in that the current law's main objective is to increase the effective use of public resources. Although the current law was enacted nine years ago, no in-depth research has been undertaken related to the extent of public savings. Thus, the aim of this research is to analyze the performance of public investments for construction with respect to their success in achieving on time and within budget completion. Additionally, a comparison between the completion duration and budget of construction projects undertaken under the current and the previous law is presented. To achieve these goals, historical contract documents addressing 878 and 575 public construction projects undertaken under two laws, respectively, were analyzed. In this context, the data mining method, including decision trees, artificial neural network, and support vector machines, was applied to predict the duration and cost deviations of the construction projects during the tender process, and the results were compared. It was demonstrated that the current law has contributed substantially towards the completion of the projects within estimated or envisaged durations and costs. The findings of this research can be generalized to countries with similar economical and organizational structures with Turkey.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Reference58 articles.

1. Abacıoğlu , M. 1999 .Devlet ihale kanunu ve ilgili mevzuat 2 [State procurement law and related legislation 2]. Baskı, Ankara : Seçkin Yayınevi . 509 p.

2. Analysis of factors influencing project cost estimating practice

3. A survey of current cost estimating practices in the UK

4. Construction Delays and Their Causative Factors in Nigeria

Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3