Author:
Ali Zainab Hasan,Burhan Abbas M.
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference77 articles.
1. Abbas, N. N., & Burhan, A. M. (2022). Investigating the causes of poor cost control in Iraqi construction projects. Engineering, Technology and Applied Science Research, 12(1), 8075–8079.
2. Abbas, N. N., & Burhan, A. M. (2023). Evaluation of the current status of the cost control processes in Iraqi construction projects. Journal of Engineering, 29(1), 128–144.
3. Ahiaga-Dagbui, D. D., & Smith, S. D. (2012). Neural networks for modelling the final target cost of water projects. In Proceedings 28th annual ARCOM conference (pp. 307–316). http://hdl.handle.net/1842/6550
4. Akinci, B., & Fischer, M. (1998). Factors affecting contractors’ risk of cost overburden. Journal of Management in Engineering, 14(1), 67–76. https://doi.org/10.1061/(ASCE)0742-597X
5. Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), 77–89.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献