Abstract
Approximately a quarter of the bridges in the United States are classified as either functionally obsolete or structurally deficient by the United States Department of Transportation (USDOT). As such, transportation agencies are challenged to handle the increasing need of upgrades with limited resources. Accelerated Bridge Construction (ABC) can reduce the construction duration and can decrease the environmental and socio-economic impacts of repair and upgrade activities by minimizing traffic disruptions. As several states are using accelerated construction techniques, a standard guideline would be highly beneficial for these agencies in developing or improving the ABC decision-making process. As problems are often project specific, a decision tool can assist in determining the viability of ABC over traditional construction methods and in selecting appropriate construction and contracting strategies on a case-by-case basis. This paper presents findings of a recent survey with regards to utilization of ABC strategies by state Departments of Transportation (DOTs), and a decision support framework which consists of three models: (1) Analytical Hierarchy Process (AHP) based ABC vs. traditional construction decision-making model; (2) ABC alternatives selection model; and (3) procurement method and contract selection model. The paper also discusses the use of ABC in New York State and describes a New York State bridge project to validate the AHP model.
Funder
University Transportation Center: Transportation for Livability by Integrating Vehicles and the Environment (TranLIVE)
University Transportation Research Center, Region 2
Publisher
Vilnius Gediminas Technical University
Subject
Mechanical Engineering,Automotive Engineering
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献