Abstract
The construction industry is a kind of multi-project engineering. The management in the construction process is an important factor in ensuring construction quality. This paper briefly introduced the relevant content of building information modeling (BIM) and the application of BIM combined with the genetic algorithm in optimizing the processing scheme in the cutting process of steel structure buildings, and took a grid-shaped steel shed in Zhengzhou, Henan, as an example to compare the traditional and BIM optimized schemes. The results showed that the BIM-optimized scheme could make better use of raw materials with different specifications and the optimization scheme had higher economic benefits because of higher utilization rate, fewer processing personnel, and fewer working hours
Publisher
Czech Technical University in Prague - Central Library
Subject
Civil and Structural Engineering
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献