Comparison of Qualifications-Based Selection and Best-Value Procurement for Construction Manager–General Contractor Highway Construction

Author:

Alleman Douglas1,Antoine Arthur1,Gransberg Douglas D.2,Molenaar Keith R.1

Affiliation:

1. Department of Civil, Environmental, and Architectural Engineering, College of Engineering and Applied Science, University of Colorado at Boulder, 428 UCB, Boulder, CO 80309-0428

2. Department of Civil, Construction, and Environmental Engineering, College of Engineering Iowa State University, 404 Town Engineering Building, Ames, IA 50011-3232

Abstract

Faster project delivery and the infusion of contractor knowledge into design are the primary drivers for choosing construction manager–general contractor (CM-GC) project delivery. This study focuses on the use of qualifications-based selection (QBS) and best-value (BV) procurement approaches, how and why agencies use each approach, and their associated opportunities and obstacles. Data for this study were obtained from a majority of federally funded CM-GC projects completed between 2004 and 2015. It was found that the use of BV procurement versus QBS procurement had no statistically significant difference in project characteristics or in performance of the projects in the data set. The choice of BV or QBS procurement coincided with an agency’s CM-GC stage of organizational development and influences of nonagency stakeholders on the CM-GC process. When agencies and the local industry were new to CM-GC, they were found to use BV procurement because it is closer to the traditional procurement culture and is perceived to result in a fair market project price. Alternatively, agencies and local industry partners with an established history of using CM-GC projects were found to choose QBS procurement. Because of the low level of design at the time of procurement, assumptions relating to risk, production rates, materials sources, and other aspects may be too preliminary to secure a reliable price. The use of BV procurement was found to pose a risk to innovation and to increase negotiation efforts. Qualitative trends from the project data, interviews, and the literature point to agencies using QBS procurement for the majority of CM-GC projects and BV procurement for CM-GC projects with lesser complexity or more highly developed designs at the time of selection.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Reference12 articles.

1. Constructability Related to TQM, Value Engineering, and Cost/Benefits

2. GransbergD. D., ShaneJ. S., AndersonS., Lopez del PuertoC., and SchierholzJ. Guide for Implementing Construction Manager/General Contractor Project Delivery on Highway Projects. NCHRP Project 10-85, Final Report. Transportation Research Board, Washington, D.C., 2015, 81 pp.

3. Defining Best Value for Construction Manager/General Contractor Projects: The CMGC Learning Curve

4. Construction Manager-at-Risk Project Delivery for Highway Programs

5. GambateseJ., DettwylerK., RoggeD., and SchroederL. Oregon Public Contracting Coalition Guide to CM-GC Contracting. Oregon Public Contracting Coalition, Portland, 2002, p. 13.

Cited by 19 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3