Implementing Best-Value Procurement for Design–Bid–Build Highway Projects

Author:

Tran Dai1,Molenaar Keith R.2,Gransberg Douglas D.3

Affiliation:

1. Department of Civil, Environmental, and Architectural Engineering, University of Kansas, 1530 West 15th Street, Lawrence, KS 66045

2. Department of Civil, Environmental, and Architectural Engineering, University of Colorado at Boulder, UCB 428, Boulder, CO 80309-0428

3. Department of Civil, Construction, and Environmental Engineering, Iowa State University, 494 Town Engineering Building, Ames, IA 50011-3232

Abstract

State departments of transportation (DOTs) have typically used low-bid procurement to deliver design–bid–build (DBB) highway projects. Although low-bid procurement has provided predictable results for state DOTs, it does not always result in the best performance during and after construction. Thus, state DOTs are increasingly using alternative methods such as best-value procurement to ensure project quality and enhance project performance. In essence, best-value procurement incorporates price with other factors to achieve specific project goals. Compared with low-bid procurement, best-value procurement offers several advantages that can include opportunities to improve project quality, promote innovation, and enhance project performance. To date, with a few exceptions, state DOTs have only used best-value procurement for design–build projects. This study explores the procedures and existing practices for implementing best-value procurement in DBB project delivery. Data were collected from a literature review, a survey questionnaire, and case studies. Three best-value DBB projects from the Michigan, New York State, and Oregon DOTs are presented. The research results showed that the use of best-value procurement for DBB project delivery can provide other benefits to state DOTs besides what was found in the literature, such as emphasizing nonprice factors that align with project objectives, reducing risk, and saving cost.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 16 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Readiness for Implemented Sustainable Procurement in Indonesian Government Construction Project;Buildings;2024-05-15

2. Lean Construction: A Sustainability Operation for Government Projects;Sustainability;2024-04-18

3. Design bid build to integrated project delivery: Strategic formulation to increase partnering;Journal of Infrastructure, Policy and Development;2023-12-11

4. Design-Bid-Build Project Delivery;The Engineer’s Project Delivery Method Primer;2022-05-19

5. Effects of Flexible Notice-to-Proceed Provisions on the Performance of Transportation Infrastructure Projects;Transportation Research Record: Journal of the Transportation Research Board;2022-01-06

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3