Abstract
A construction project which involves multiple contractors will always slip away and delay from the project master schedule because of lack of communication and mismanagement of schedule to avoid this problem various studies have been followed but the results are not positive so in this a new method of framework is going to implement. The framework is based on a method of Hybrid cooperation coevolution algorithm based on the algorithm. In this we rank the constrains that affect the project schedule by analysing the survey results and then the framework will be formed according to the constrains to improve the schedule process. we can subdivide the schedule and daily task allotment so that the planned schedule will not slip away Construction projects involve complex processes and multiple stakeholders, which makes it challenging to manage project schedules effectively. To address this issue, a Hybrid Cooperative Framework for Large Scale Construction Project Schedule Analysis (HCF) has been proposed. This framework combines traditional project management techniques with advanced machine learning algorithms to enhance the accuracy of project schedules and improve project performance. In this study, we aim to analyze the effectiveness of the HCF in managing large-scale construction projects. We will evaluate the framework's ability to improve project scheduling accuracy, reduce project delays, and enhance stakeholder collaboration. The study's findings will provide valuable insights into the application of advanced technologies in construction project management and contribute to the development of more efficient project scheduling approaches
Reference33 articles.
1. Wang, X. (2020). A Construction Schedule Robustness Measure Based on Improved Prospect Theory and Copula-CRITIC Method. Mathematical Problems in Engineering, 2020, 1-14.
2. Kamarah, E. (2020). Framework for schedule optimization of repeating projects with dispersed sites. Journal of Construction Engineering and Management, 146(9), 04020102.
3. Shamayleh, A. (2020). A new approach for prioritizing sustainability-related construction project risks using Monte Carlo simulation. Journal of Cleaner Production, 275, 123157.
4. Meng, F. (2022). Research on construction schedule management based on big data analysis. Journal of Advanced Transportation, 2022, 1-12.
5. Li, S. (2022). Double-level quantitative model for urban rail transit network construction schedule planning. Journal of Advanced Transportation, 2022, 1-14