Risk assessment in railway rolling stock planning

Author:

Gołębiowski Piotr1,Góra Ignacy2,Bolzhelarskyi Yaroslav3

Affiliation:

1. Warsaw University of Technology, Faculty of Transport, Warsaw, Poland

2. Office of Rail Transport, Warsaw, Poland

3. Lviv Polytechnic National University, Institute of Mechanical Engineering and Transport, Lviv, Ukraine

Abstract

Rolling stock planning is one of the steps in the traffic planning process considered from the railway undertaking's point of view. It is directly related to the efficiency of rolling stock utilisation, which should be ensured at the highest possible level in the case of rail transport. The planning work stage is subject to certain risks (threats and opportunities), which, if they materialise, will impact it. It, therefore, makes sense to carry out analyses that can anticipate specific events in good time and introduce appropriate countermeasures in advance. This article aims to conduct a risk assessment process concerning rolling stock planning. It was assumed that the considerations were carried out based on the M_o_R (Management of Risk) methodology. Based on this methodology, risk identifica-tion and risk analysis (estimation of risk impact) were carried out. Risk assessment was carried out using the Monte Carlo simulation method. The work identified sixteen risks that represent threats. The principle of risk description was used to identify risks. It requires indicating for each risk the reason for its occurrence and the effect it may have. As a part of risk estimation, variables were selected to assess each risk's impact on the objectives of the stage. Publicly available statistical data were used to define the variables. The variables were expressed in monetary units. The work identified five variables describing impact, which were assigned to the individual risks. As a trian-gular probability distribution was used for the variability of impact description, the variable's minimum, most likely, and maximum value was identified. A risk assessment was carried out for only two impact description varia-bles (for those variables used to describe the impact of the most significant number of risks). For each variable, statistical parameters were indicated and analysed. The resulting value of the variable describing the impact was then read out for each percentile, and the expected value of the risk was calculated. A detailed risk assessment was made for the lower, middle and upper quartiles. A histogram of the incidence of each variable value was presented, and an assessment was made.

Publisher

Politechnika Warszawska - Warsaw University of Technology

Subject

Transportation,Automotive Engineering

Reference68 articles.

1. Alfieri, A., Groot, R., Kroon, L., Schrijver, A., (2006). Efficient Circulation of Railway Rolling Stock. Transportation Science, 40(3), 378-391.

2. Ambroziak, T., Pitka, R., (2008). Metoda komputerowego wspomagania wyznaczania harmonogramw pracy pojazdw trakcyjnych. Prace Naukowe Politechniki Warszawskiej. Transport, 64, 13-18.

3. AXELOS Ltd., (2010). Zarzdzanie ryzykiem. Przewodnik dla praktykw. Londyn: TSO.

4. Bauch, H., (2007). Ryzyko w eksploatacji nawierzchni kolejowej. Problemy Kolejnictwa, 145, 5-28.

5. Baranovskyi, D., Muradian, L., Bulakh, M., (2021). The Method of Assessing Traffic Safety in Railway Transport. IOP Conference Series: Earth and Environmental Science (EES), 666, 042075.

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3