Managing Delays in Construction Projects Aiming at Cost Overrun Minimization

Author:

Anysz Hubert

Abstract

Abstract The effects of the delay in construction contract execution are always negative for every party being involved. Cancelling the delays of the time schedule means the use of more production means that it was planned. It creates an additional cost. If the delays of the schedule are not cancelled, the contractor suffers from the cost increase. The penalties arisen from not keeping the milestones or the completion date are expected too. There is a trade-off: cancelling delays spending additional money now (during the contract execution) or executing a delayed contract till its end awaiting for its final settlement (showing the cost increase) and possible penalties. There is no one, correct answer how to manage a delayed construction project. There is a natural unwillingness to spend money over the budget. Nevertheless, the delayed completion date can cause much higher contractor’s expenses, than cancelling delays during the contract execution. The decisions made by the project manager depend on various factors discussed in the paper. A delay concerning the single task increases the cost of its execution at a different level. The same, the level of influence of delaying a single task, influences the completion date with varied strength. These influences depend on the location of the task in a net model – the base of a schedule. The tasks located on the critical path – defined in the Critical Path Method – should be of the special care. However, delays on not critical tasks can also break the budget and the planned completion date. The nature of delay is important as well. Lowered productivity of a workers’ brigade can make the execution of the task longer, the same as forced breaks in their efficient work. The reaction of a site manager to such causes of delay should be different, as the origin of the delays is different. The impact of the delay noticed on the single task is discussed in the paper and possible reaction (varied on the type of a delay and a task location too) are proposed. The proposed solutions aim at cost minimizing considering the total expenses spent by a contractor and possible penalties in case of the delayed completion date of a construction contract.

Publisher

IOP Publishing

Subject

General Medicine

Reference22 articles.

1. The profit as in-company evaluation of the construction site effectiveness;Anysz;MATEC Web of Conferences,2017

2. The Conjugated Triangle Method CTM of the detection of inconsistent bids in the construction industry;Anysz;MATEC Web of Conferences,2018

3. Integrated cost and schedule control – a survey of UK experience;Webb;The Engineering Management Journal,1995

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3