Design and Rapid Construction Technique for Bibanpo High-speed Railway Bifurcation Tunnel

Author:

Jiang Xinghong,Li Ke

Abstract

Abstract In China, the construction of high-speed railway infrastructure plays a more and more important role in promoting economic growth. However, because of its large turning radius and incapability in bypassing and avoiding, the length of development line cannot meet the needs of separating tunnel, which has driven high-speed railway tunnel bifurcation structure become a necessity in regions with steep high mountains, gorges, ridges and valleys. In the big excavation area of bifurcation transition section, long construction period and collapse of the surrounding rock often happen. To solve those problems, we proposed a new method with rapid holing through procedure and pre-stressed anchor cable support. The methods go as follows. We put forward an optimized process of excavating and breaking through one side of the tunnel first and drilling back through the other side in consideration of the large excavation area and long construction period. We presented reinforced support system of pre-stressed anchor cable in view of problems including surrounding rocks with no secondary lining, unstable structure and unbalanced load releasing. The system has been applied to Bibanpo tunnel, a project in Shanghai-Kunming high-speed railway. By using this method, all difficulties during construction have been broken through, The study could be used as a valuable example for bifurcation structure construction in urban arterial roads and high-speed railway tunnel with the similar geological conditions such as Chengdu-Kunming high-speed railway, Chongqing-Kunming high-speed railway, and Chongqing-Changsha high-speed railway which are going to be constructed.

Publisher

IOP Publishing

Subject

General Medicine

Reference15 articles.

1. Spatial load-structure calculation method for a deep forked tunnel;Ding;China journal of highway and transport,2016

2. Study of stability of transition segment for bifurcation tunnel;Wei;China Journal of Highway and Transport,2011

3. Shallow tunnel construction with irregular surface topography using cross diaphragm method;Fang;Tunn. Undergr. Sp. Tech.,2017

4. Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation method;Li;Tunn. Undergr. Sp. Start to excavate the monitoring point in the right tunnel Tech,2016

5. Numerical simulation research of construction method for shallow buried large section tunnel;Zhu;Open Civil Eng. J.,2016

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3