Publisher
Springer Science and Business Media LLC
Reference36 articles.
1. TB 10003—2016. Code for design of railway tunnel [S]. (in Chinese)
2. WANG Han-peng. Key teconology study on forked tunnel design and construction [D]. Jinan: Shandong University, 2007. (in Chinese)
3. JIANG Xing-hong, LI Ke. Design and rapid construction technique for bibanpo high-speed railway bifurcation tunnel [J]. IOP Conference Series: Materials Science and Engineering, 2020, 741(1): 012114. DOI: https://doi.org/10.1088/1757-899x/741/1/012114.
4. DING Wen-qi, ZHENG Kang-cheng, JIN Wei. Spatial load-structure calculation method for a deep forked tunnel [J]. China Journal of Highway and Transport, 2016, 29(2): 90–97. DOI: https://doi.org/10.19721/j.cnki.1001-7372.2016.02.011. (in Chinese)
5. LI Yong, WANG Han-peng, CAI Wei-bing, et al. Stability monitoring of surrounding rock mass on a forked tunnel using both strain gauges and FBG sensors [J]. Measurement, 2020, 153: 107449. DOI: https://doi.org/10.1016/j.measurement.2019.107449.