Author:
Kondo Y.,Morishita T.,Hirano K.,Ito T.,Kikuzawa N.,Kitamura R.,Oguri H.,Ohkoshi K.,Shinozaki S.,Shinto K.,Fang Z.,Fukui Y.,Futatsukawa K.,Ikegami K.,Miyao T.,Nanmo K.,Otani M.,Shibata T.,Hori T.,Nemoto Y.,Sato Y.,Kobayashi F.,Takahashi D.,Tasaki R.,Ito Y.,Kato Y.,Ishiyama T.,Sawabe Y.
Abstract
Abstract
We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac’s, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.
Subject
General Physics and Astronomy
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献