Author:
Zelentsov L,Mailyan L,Pirko D
Abstract
Abstract
The article discusses the issues of forecasting two key parameters of an investment and construction project: time and cost, while the building company is considered as a complex dynamic system. Taking into account the long-term nature of the creation of construction products and, as a consequence, the high level of work in progress, the need to use forecasting models is justified, both at short-term planning intervals (week, month) and at longer intervals (quarter, year). The article examines the formalized forecasting methods, gives a characteristic of the methods most widely used in practice. These methods include forecasting based on ARIMA models. DSTU has developed a pilot software package for an intelligent construction management system, which includes a software package for forecasting the time and cost parameters of a construction object at the stages of operational and current management.
Subject
General Physics and Astronomy
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献