Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm

Author:

Yu Xiaobing1,Zuo Hengzhong2ORCID

Affiliation:

1. Hunan Vocational College of Engineering, Zhengzhou, Hunan 410151, China

2. Changsha University of Science and Technology, Changsha, Hunan 410076, China

Abstract

At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors.

Funder

Innovation and practice of talent training model for engineering construction specialty cluster under the background of natural resources

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Reference28 articles.

1. Study on visualization of construction schedule management under BIM Scenarios[J];J. I. Fanrong;Construction Economy,2014

2. Study on construction schedule management and control method for Hydraulic & Hydropower engineering based on visual simulation[J];S. Yang;Systems Engineering-Theory & Practice,2006

3. System reliability theory based multiple-objective optimization model for construction projects

4. Progress monitoring for a highway project with cpm network plan[J];P. Bhaskaran;Indian Highways,1988

5. Project progress tracking template -using a repeatable gss process to facilitate project process management[J];F. Chen,2017

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3