Affiliation:
1. Hunan Vocational College of Engineering, Zhengzhou, Hunan 410151, China
2. Changsha University of Science and Technology, Changsha, Hunan 410076, China
Abstract
At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors.
Funder
Innovation and practice of talent training model for engineering construction specialty cluster under the background of natural resources
Subject
General Engineering,General Mathematics
Reference28 articles.
1. Study on visualization of construction schedule management under BIM Scenarios[J];J. I. Fanrong;Construction Economy,2014
2. Study on construction schedule management and control method for Hydraulic & Hydropower engineering based on visual simulation[J];S. Yang;Systems Engineering-Theory & Practice,2006
3. System reliability theory based multiple-objective optimization model for construction projects
4. Progress monitoring for a highway project with cpm network plan[J];P. Bhaskaran;Indian Highways,1988
5. Project progress tracking template -using a repeatable gss process to facilitate project process management[J];F. Chen,2017
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献