Author:
Soós C.,Bergin D.E.,Detraz S.,Lalović M.,Marcon L.,Olanterä L.,Prousalidi T.,Sandven U.,Scarcella C.,Sigaud C.,Troska J.
Abstract
Abstract
The Versatile Link+ project targeting the Phase 2 HL-LHC detector upgrades is entering the production phase. After several years of prototyping, the industrialisation of the Versatile Link+ Transceiver (VTRx+) was launched in 2021 and the production is scheduled to start in 2022. We describe the extensive qualification effort carried out and the quality assurance procedures put in place to monitor the manufacturing quality. We summarise the experience of the industrialisation and we present the plans for the production.
Subject
Mathematical Physics,Instrumentation
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献