Asadi R,Rotimi J O B,Wilkinson S
Abstract
Abstract
Rework is one of the leading causes of cost and time overruns that primarily affect project performance. The performance of construction projects can be elevated with the implementation of rework moderation strategies. Identifying rework root causes is the first step of rework management followed by a mitigation approach, reducing or preventing strategy. As the contract is the core connection between clients and contractors, using a rework management approach in the contracting process allows participants to be aware of rework impacts before the project’s commencement. Selecting the best approach for rework mitigation depends on rework causes and their classified roots. Thus, the paper classifies rework root causes in the design stage of projects to provide a platform for contract documents assessment. The method used to classify the identified rework causes into five categories was designed on the literature. Results from collecting secondary data indicated all categories in the design stage, consisting of technical, human resources, process, material/equipment, and other general factors. The next step of the study is to assess contract documents through a questionnaire based on these classified factors in search of a connection between rework, contractual claims, and clauses of the contract. The paper recommends that assessing contract documents can be used as a new approach for rework management.
Reference48 articles.
1. Determinants of rework in building construction projects;Love;Engineering, Construction and Architectural Management,2004
2. Rework management in construction projects and comparison with time and cost;Ahmed;International Journal of Innovative Research in Science, Engineering and Technology,2016
3. Factors affecting rework cost in construction;Forcada;Journal of Construction Engineering and Management,2017
4. Benchmarking, bench-action, and bench-learning rework mitigation in projects;Love;Journal of Management in Engineering,2003
5. Mapping rework causes and effects using artificial neural networks;Palaneeswaran;Building Research & Information,2008
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Predicting the Cost of Rework in High-Rise Buildings Using Graph Convolutional Networks;Journal of Construction Engineering and Management;2024-08
2. InteriorScape: Simulation and Design of 3D Space Modelling Utilizing Position Adaptive Convolution Network;2024 7th International Conference on Informatics and Computational Sciences (ICICoS);2024-07-17
3. A Review on Adoption of Bim in Reducing Construction Rework;International Journal of Advanced Research in Science, Communication and Technology;2023-12-31