A Review on Adoption of Bim in Reducing Construction Rework

Author:

Shrividya S 1,Sindhu Vaardini U 1

Affiliation:

1. Kumaraguru College of Technology, Coimbatore, India

Abstract

In the construction industry, the aim of project control is to ensure that the projects are completed on time, within budget and achieving other project objectives .Rework is one of the most major problems in the construction industry. It has an impact on time, cost, quality, and practically every other project success factor. There is always a significant loss of resources, materials, investments, and workforce-time as a result of rework and poor use of resources and materials in the works. Rework may be reduced by designing and planning with full understanding of customers and stakeholders, good communication amongst project aspects, applying quality management systems, and utilizing Information Technology. Because of the worldwide expansion of IT and the widespread use of BIM ,which coordinates all of the software and parts of the construction--the appearance of mistakes and inconsistencies has been drastically reduced in recent years, allowing specialists to realize their full potential in doing projects. To the best of the author’s knowledge, this study is to use actual project data to measure the effects of BIM implementation on rework in construction projects. The study's findings enable practitioners to develop techniques to reduce rework with BIM implementation, enhance project cost and time performance, and increase project delivery efficiency

Publisher

Naksh Solutions

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3