Effect of start and stop cycles on hydropower plants: modelling the deterioration of the equipment to evaluate the cycling cost

Author:

Savin Olivian,Badina Carmen,Pollier Renaud,Drommi Jean-Louis,Baroth Julien,Charbonnier Sylvie,Berenguer Christophe

Abstract

Abstract With the high energy demand, renewable energies emerged and the deregulation of the energy market appeared in the late ’90. These types of energies are intermittent and can produce high fluctuations in the power grid because they are connected only in certain weather conditions (for example: solar energy can be produced only by day and wind energy only when it is windy). Hydropower energy is recognized for its flexibility in responding to the demands of the network in order to maintain a constant level of energy and to guarantee the security of the electrical network. Nowadays, the hydropower plants are the main provider of energy adjustments thanks to a high number of start and stop cycles (which can sometimes be around 6 per day), the fast variations in load and the use of PSH (pumped-storage hydropower). But these rapid changes in the production conditions of hydroelectric power plants lead to high stresses on the components and consequently to faster degradation (mechanical, electrical, thermal, hydraulic, etc.). This work focuses on the design of a methodology that relies on auditable methods to estimate the cost of start and stop cycles and presents three complementary, representative (by equipment), reproductible (can be applied by different operators) methods based on explicit assumptions and validated by experts and in function of the available data in order to estimate the degradation of the main components of the hydropower plant (shut-off valve, runner, generator, transformer and circuit-breaker). These methods are based on the main degradation phenomena. The first method uses on-site measurements to study the fatigue on runners, the second method uses a reliability law to estimate the lifetime of generators and a predictive model using online temperature measurements and the last method uses expert judgement due to the lack of measurements on the equipment.

Publisher

IOP Publishing

Subject

General Engineering

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Machine Learning-Assisted Operation Monitoring Analytics on a Hydro Power Plant;2024 6th Global Power, Energy and Communication Conference (GPECOM);2024-06-04

2. Performance Analysis of a grid connected Hydropower plant for Load Rejection and Addition cases;2024 1st International Conference on Innovative Sustainable Technologies for Energy, Mechatronics, and Smart Systems (ISTEMS);2024-04-26

3. Operation related maintenance and reinvestment costs for hydropower scheduling;Energy Systems;2023-06-21

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3