Effect of transparency on the development phase of public-private partnership: Analysis of highway projects

Author:

Nayyer Mojahedul Islam,Aravindan Mukkai R,Thillai Rajan A

Abstract

Abstract The impact of transparency on large Public-Private Partnership (PPP) projects has been a topic of interest for scholars and policymakers. However, empirical evidence of its impact has been limited. Governments from more than 100 countries across the globe have enacted transparency laws in the recent past. The development phase of PPP projects is critical for the success of the subsequent two phases- construction and operation. The objective of this study was to determine the influencing characteristics of projects and the environment in which they operate, as well as the impact of transparency laws on the duration of the development phase. Regression analysis using data of 469 PPP highway projects implemented in India revealed that concession period, length of the road, nodal authority implementing the project, duration of the construction phase, and road density in the region significantly impact the duration of the development phase. Mean comparison and regression analysis showed that the projects implemented after the enactment of the transparency law had a longer development phase. However, the projects with a longer development phase had a shorter construction phase. Understanding the factors affecting the duration of the development phase will help the nodal authority and the concessionaire to develop strategies to complete the project in a reasonably time-bound manner.

Publisher

IOP Publishing

Subject

General Engineering

Reference24 articles.

1. Stages of PPP and Principal–Agent Conflicts: The Swedish Water and Sewerage Sector Public Perform;Smith;Manag. Rev.,2018

2. India - Financing Infrastructure: Addressing Constraints and Challenges;Financ. Priv. Sect. Dev. Unit South Asia Reg.,2006

3. Evaluation and management of political risks in China’s BOT projects;Wang;J. Constr. Eng. Manag.,2013

4. Assessment of the impact of the crisis on new PPI projects: update 5;Izaguirre;Priv. Particip. Infrastruct. Database,2010

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3