Forensic Delay Analysis as Evidence of Transaction Costs in Construction Projects

Author:

Atanasov V A,Greenwood D J,Ross H,Sanchez D E

Abstract

Abstract Construction projects are characterised by supply chains with multiple contracts and significant transaction costs. An example of these costs is to be found in the management of project delays. The operationalisation and measurement of transaction costs, especially in the construction context, has hitherto proved difficult. The work reported here is concerned with defining and measuring the resources required for the management of contractual disputes relating to project delays. Its main argument is that concepts from transaction cost economics (TCE) theory (bounded rationality, uncertainty, information asymmetry, and opportunistic behaviour) present serious problems for transaction efficiency. This is exemplified in forensic analysis of construction project delays. Data from twelve case studies are analysed, to reveal that up to 90% of time spent on delay analysis was concerned with searching for and validating information which could, ostensibly, be automatically and reliably captured using digital technologies. This research forms part of a wider study that considers the implications of the identified inefficiencies and makes a case for the exploitation of advances in information technology on the more efficient resolution (or even avoidance) of contractual disputes. It concludes that there is a prima facie case for this, and therefore for the reduction in the transaction costs that relate to the management of construction project delays.

Publisher

IOP Publishing

Subject

General Engineering

Reference55 articles.

1. Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications;Adam;Engineering, Construction and Architectural Management,2017

2. The 4Ps: A framework for evaluating construction projects delays;Ansah;Journal of Engineering and Applied Sciences,2018

3. Causes of delays on construction projects: a comprehensive list;Durdyev,2019

4. Factors affecting schedule delay, cost overrun, and quality level in public construction projects;Larsen;Journal of Management in Engineering,2016

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3