1. Breyfogle, F. III (1999), Implementing Six Sigma: Smarter Solution Using Statistical Methods, John Wiley & Sons, Inc., New York, NY.
2. Cook, D. (1994), “A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks”, Production and Inventory Management Journal, Vol. 35 No. 1, pp. 73‐8.
3. Cox, J.F. and Spencer, M.S. (1998), The Constraints Management Handbook, St. Lucie Press, Boca Raton, FL.
4. Evans, J.R. and Lindsay, W.M. (2002), The Management and Control of Quality, 5th ed., Thomson Learning, Stamford, CT.
5. Goldratt, E.M. and Cox, J. (1992), The Goal, 2nd revised ed., The North River Press, Croton‐on‐Hudson, NY.