Improving the time-based performance of the preparatory stage in textile manufacturing process with value stream mapping

Author:

Hussain DeedarORCID,Figueiredo Manuel CarlosORCID

Abstract

PurposeThe evaluation of time-based performance is a valued approach in the lean management thinking which is based on delivering value from customer's perspective. This approach contributes for long-term competitiveness and success in today's business environment. The focus of this study is to analyse the cycle time and manufacturing lead time with value stream mapping (VSM) in the preparatory stage of the textile fabric manufacturing process and to identify and improve the non-value adding activities in the value chain (VC). The study presents an insight on the translation of performance improvement across functions and how upstream supply chain (SC) segments can be linked in the performance improvement program. It also covers how the application of VSM improves visibility and planning flexibility in textile fabric manufacturing process.Design/methodology/approachThe time-based performance was evaluated using VSM and recording of the activity times in the existing process. The impact of the quality of supplier's raw material was also measured contributing to identify the strategy for procurement and the means to establish a feedback system to the upstream segments of the SC. The methodology of VSM, observation of the practice and the expertise of the individuals involved with the process were utilised to develop the value stream maps and to identify value adding activities, non-value adding activities, existing gaps and plans for improvement.FindingsThe means for improving the time-based performance were identified and their impact was measured. The factors responsible for improvement are related to the production system and with the procurement strategy. The improvement was achieved in terms of available capacity utilisation, balancing the work flow in the preparatory stages, visibility of the process by measuring its capability and flexibility for the planning function. The study revealed that the effectiveness and enhancement of VSM and related tools should be adopted to address the issue of limiting success rates of long term and repeating application of such tools. Continuous improvement, innovations and the systematic embedding of VSM in the process life cycle provide the ways for achieving long-term success.Research limitations/implicationsThe paper presents a real and in-depth study on the application of VSM in the textile manufacturing process. The scope of the study is broad; it covers activities across functions with actual estimates of activity times in the manufacturing process for the focused value streams. It offers researchers the opportunity to analyse the translation of productivity improvement across functions and how upstream SC segments can be linked in a performance improvement program.Practical implicationsThe study offers useful insight for the managers in textile manufacturing and other sectors for improving the time-based performance and achieving higher utilisation of capacity. It identified the production factors and their impact on warping and sizing cycle time in selected value streams and those which share common activities. It also identified the directions for future research when repeating the application of VSM in the continuous improvement cycle. Furthermore, since the industries need to progress towards advanced systems including Industry 4.0 standards, adoption of advanced VSM tool with relevant technology can align their production systems to develop the required capability. This will also bring a sustainable competitive advantage in the system.Social implicationsThe focused sector is stagnant in terms of productivity and innovation. The adoption of the advanced tools can facilitate the implementation of continuous improvement and innovation strategies.Originality/valueThe main focus of this study is to analyse and improve the cycle time in the preparatory stage of the fabric manufacturing process. This has impact on other important and tangible measures including capacity utilisation and work flow and intangible measures including production planning flexibility and process visibility. The improvement impact is across departments.

Publisher

Emerald

Subject

Business, Management and Accounting (miscellaneous),Business and International Management

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3