The common causes of rework in construction contracts: a diagnostic approach

Author:

Asadi Ramin,Wilkinson Suzanne,Rotimi James Olabode Bamidele

Abstract

Purpose The high rate of rework that occurs in construction projects has a negative effect on the performance of the construction projects. Although several mechanisms have been implemented to control reworking, a comprehensive list of rework causes is yet to be provided to present the common causes that contribute to rework in construction contracts. This paper aims to investigate the most common rework causes that need to be addressed in construction contracts. Design/methodology/approach A mixed-method using both the qualitative and quantitative approach is used in this paper. First of all, the study adopted a four-step literature review to introduce the rework research trends and provide statistical reports using descriptive analysis. Next, a comprehensive review has been completed using content analysis to identify the common causes of rework in construction projects. Finally, the common causes in construction contracts are further investigated through a quantitative questionnaire survey to validate the initial results. Findings The results of the review showed an increasing trend of publications on rework over the last three decades. Most of the studies were conducted in Australia, the UK, Nigeria and Hong Kong. Based on further investigation in the study area of sources of rework, 37 causes of rework causes were identified and classified in five groups. Then, the most significant causes of rework in construction contracts were compiled in the list of 22 items. Research limitations/implications The paper’s reported result, contributes to the contract management body of knowledge by proposing a list of common rework causes that can be used by practitioners during the contract negotiation to prevent contractual issues. The result of the review can also be used for further investigation of the relationship between rework and contract conditions. Originality/value The proposed list of common causes of rework in construction contracts allows project parties to improve the terms of the contract in addressing rework, this could result in fewer contractual claims and disputes. The findings of this study will also guide the investigations into the contract conditions, thus the approach used is constructive.

Publisher

Emerald

Subject

General Engineering

Reference79 articles.

1. Rework management in construction projects and comparison with time and cost;International Journal of Innovative Research in Science, Engineering and Technology,2016

2. Causes of rework on building construction projects in Nigeria;Interim, Interdisciplinary Journal,2013

3. Using system dynamics modelling principles to resolve problems of rework in construction projects in Nigeria;Journal of Construction Project Management and Innovation,2015

4. Occurrence of rework on components of building project in Lagos state, Nigeria;International Journal of Sustainable Construction Engineering and Technology,2017

5. Effect of rework on project performance in building project in Nigeria;International Journal of Engineering Research and Technology,2015

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Influence of rework on construction project performance in Nigeria;International Journal of Construction Management;2023-09-09

2. Analyzing Underlying Factors of Rework in Generating Contractual Claims in Construction Projects;Journal of Construction Engineering and Management;2023-06

3. AI and BIM-based Construction defects, rework, and waste optimization;2023 International Conference on Emerging Smart Computing and Informatics (ESCI);2023-03-01

4. Rework causes classification model with liable parties of the contract in construction projects;Frontiers in Built Environment;2023-02-16

5. Guidelines for Mapping Rework in the Contract Conditions of Construction Projects;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2023-02

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3