Barriers in contractual scope management of international development projects in Afghanistan

Author:

Hilali Ahmadullah,Charoenngam Chotchai,Barman AnkitaORCID

Abstract

Purpose For construction and management, the existing codes of practice of international organizations such as US Army Corps of Engineers, the Asian Development Bank, the World Bank, the United Nations Office for Project Services, etc., often prove ineffective when applied in post-war countries like Afghanistan. Domestic contractors faced maximum challenges in contractual scope management, which was implemented by such organizations based on their existing codes of practice. The purpose of this paper is to understand these barriers in scope management as faced by the domestic contractors of Afghanistan. Design/methodology/approach The research employs a mixed methodology to cater to its objectives. Face-to-face structured interviews of 14 industry experts and extensive literature review were conducted to identify unique barriers pertaining to Afghanistan construction industry. Further, quantitative assessment of these barriers through the statistical tools of “mean score ranking,” “Kendall’s test” and “independent sample t-test” was carried out to understand the severity of the barriers. Findings In total, 39 unique barriers were identified under the groups of “scope formulation,” “scope completeness,” “scope pricing,” “scope implementation” and “scope change control.” The consequential impacts of these barriers and their existence at different stages of the project were illustrated. The most severe barriers were identified as the “inadequacy of site investigation reports” and the “unavailability of resources in local markets.” Originality/value The understanding of the challenges faced by local stakeholders, as highlighted by this study, can be utilized by these international organizations in their strategy and planning to ensure successful projects while also propagating the adoption of sustainable construction practices.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference50 articles.

1. Economic reconstruction of Iran: costing the war damage;Third World Quarterly,1990

2. ADB (2015b), “Asian Development Bank Member Fact Sheet”, Asian Development Bank, available at: www.adb.org/countries/afghanistan/main (accessed May 18, 2016).

3. Fundamental uncertainties in projects and the scope of project management;International Journal of Project Management,2006

4. Incorporating uncertainty in competitive bidding;International Journal of Project Management,2000

5. Collaborative negotiation behaviors in Thai construction projects;Journal of Legal Affairs and Dispute Resolution,2011

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3