Abstract
PurposeThe poor quality of construction work in war-affected regions is a significant issue. The large-scale destruction to the existing infrastructure from the war necessitates cost and time-efficient delivery of construction projects during and post-war to bring normalcy to affected lives and places. Consequently, there is always a tendency to finish construction projects in the shortest possible time on a limited budget without following the proper quality management processes. However, the poor quality of construction projects continues to affect the country's development, growth, credibility, reputation, and public safety for several years after the war. To this end, the present study was conducted to evaluate the significant attributes and factors contributing to the poor quality of construction projects in the war-affected Afghan construction sector.Design/methodology/approachA total of 31 attributes influencing construction project quality were ranked based on 110 completed survey responses collected from Afghan construction professionals. Moreover, independent samples t-test, Spearman's rank correlation test, and exploratory factor analysis were conducted.FindingsThe study found a moderate consensus between clients and contractors on attributes' rankings. In addition, the independent samples t-test showed statistically significant differences in means values of responses from clients and contractors for eight attributes. Based on factor analysis, 19 important attributes (median value greater than or equal to four) were classified into 4 latent factors – (1) poor-quality assurance and control, (2) unethical practices, (3) design and drawing errors, and (4) knowledge and skills gap.Originality/valueEvaluating the factors affecting the quality of construction projects will help clients, government departments, and construction practitioners improve the construction quality management practices. The findings will also inform the policies and procedures of international aid providers.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference89 articles.
1. Causes of delay in building construction projects in Egypt;Journal of Construction Engineering and Management,2008
2. Does professional ethics affect quality of construction–a case in a developing economy?;Total Quality Management and Business Excellence,2014
3. Mixed method research: fundamental issues of design, validity, and reliability in construction research;Journal of Construction Engineering and Management,2009
4. Financial reconstruction in conflict and post-conflict economies,2001
5. Challenges for engineering design, construction, and maintenance of infrastructure in Afghanistan, cold regions research and engineering laboratory,2010
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献