Improved reliability in planning large-scale infrastructure project delivery through Alliancing

Author:

Walker Derek H.T.ORCID,Vaz Serra PauloORCID,Love Peter E.D.ORCID

Abstract

PurposePrice reliability for complex and highly complicated infrastructure projects is problematic. Traditional project delivery approaches generally fail in achieving targeted end cost reliability. However, integrated project delivery (and particularly Alliancing), develop a far more reliable and robust project delivery plan and outturn time-cost targets. This paper aims to explore why this may be the case.Design/methodology/approachThis case study investigated the project design, planning, cost/time estimation approach and how risk/uncertainty was dealt with. Five senior project delivery experts from an organisation that delivers multi-billion-dollar infrastructure projects in Australia were interviewed. These five experts collectively had 100+ cross-disciplinary experience years delivering complex infrastructure projects.FindingsAlliancing adopts a radically different approach to project design, time/cost planning and risk assessment and management to traditional project delivery approaches. Key findings explain how the project alliance agreement designs-in processes that maximises team integration and collaboration. Analysis concludes that design thinking is used to craft and shape collaborative behaviours and project governance. Additionally, including project owner and facilities operator representatives in the project team adds valuable insights, expertise and knowledge contributing to planning reliability.Research limitations/implicationsThis study is exploratory and focussed on complex infrastructure projects so findings cannot be generalised.Practical implicationsWe unpack Alliancing processes that develop the target outturn cost plan, comprising a holistic and realistic plan to design a project to meet expected project outcomes. This case study may serve as an exemplar for complex project delivery.Social implicationsThis paper illustrates how Alliancing more effectively delivers best value than traditional procurement approaches through its TOC-TAE processes.Originality/valueThe paper contributes to the scant existing academic literature analysing these processes. Its novel contribution is explaining how Alliancing treats unexpected events that in traditional delivery forms trigger expensive and time-energy-wasting disputation. This case study may serve as an exemplar for complex project delivery.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference75 articles.

1. Statistical characteristics of cost contingency in water infrastructure projects;Journal of Construction Engineering and Management,2014

2. Maximizing owner value through target value design;AACE International Transactions,2010

3. Quick abnormal-bid-detection method for construction contract auctions;Journal of Construction Engineering and Management,2015

4. Innovation as a learning process: embedding design thinking;California Management Review,2007

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3