Research on Collaborative Mechanisms of Railway EPC Project Design and Construction from the Perspective of Social Network Analysis

Author:

Fan Zilu1ORCID,Liu Yuming1,Li Yaxin1

Affiliation:

1. School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China

Abstract

With the promotion of Engineering Procurement Construction mode in railway construction projects, collaborative management between design and construction has faced increasing challenges due to complexities of the participants and the various professional fields involved in railway EPC projects. This paper aims to analyze the issues present in the collaborative management of railway EPC project design and construction. Utilizing the social network analysis methodology combined with the Wuli–Shili–Renli (WSR) system methodology, a network model was established to explore relationships between design and construction management. This study investigates network-influencing factors and proposes targeted measures to enhance project management efficiency. The findings indicate that coordination and communication mechanisms, organization building, interface management systems and design management systems represent core network elements that significantly impact railway EPC collaborative management. These elements are closely related to other network factors. The research not only advances design and construction coordination theory, but it also introduces new ideas for engineering practice.

Funder

Fundamental Research Funds for the Central Universities

State Key Laboratory for Track Technology of High-Speed Railway, China Academy of Railway Sciences

Publisher

MDPI AG

Subject

Information Systems and Management,Computer Networks and Communications,Modeling and Simulation,Control and Systems Engineering,Software

Reference59 articles.

1. Joint Contract-Function Effects on BIM-Enabled EPC Project Performance;Lee;J. Constr. Eng. Manag.,2020

2. Profit Sharing Mechanism of Large EPC Project considering the Behavior of Fairness Concern;Li;Adv. Civ. Eng.,2020

3. Schedule control model for linear projects based on linear scheduling method and constraint programming;Tang;Autom. Constr.,2014

4. Application of BP Neural Network Model in Risk Evaluation of Railway Construction;Yang;Complexity,2019

5. Lesniak, A., and Janowiec, F. (2019). Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network. Sustainability, 11.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3