Author:
HOLT GARY D.,OLOMOLAIYE PAUL O.,HARRIS FRANK C.
Abstract
A quantitative contractor selection technique which embraces the pre‐qualification, evaluation and final selection processes is being developed. The emphasis is on evaluating contractors' performance potential in terms of their ability to achieve time, cost and quality standards. This approach is in contrast to the majority of current selection techniques which tend to prequalify, then discriminate predominantly on the cost component of tenders. The conceptual model is applied to a hypothetical but realistic scenario of a contractor competing for a small industrial contract. This illustrates the mechanics of the new technique, emphasizing that contractor selection should include identifying the contractor with the best performance potential and not merely the lowest bidder.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference30 articles.
1. Diekmann, J.E. (1979) Selection ofcost plus contractors using normative decision methodologies. PhD thesis,University of Washington.
2. Quality Assurance in Building
Cited by
40 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献