Abstract
Construction contractors significantly contribute to the progress and success of projects. Contractor prequalification grants tendering rights only to competent contractors. The bidding process is one of the most critical phases in the construction industry. The project leader must assess the general, technical, and financial information of the contractors to prepare an accurate proposal and select the best contractor. In this study, contractor prequalification is considered, along with the complex relationships between various criteria. ISM is a computational method that involves a qualitative and interpretive approach to solving complex problems based on structural mapping of the connections between attributes and their subsequent transformation into a multilevel structural model. Using ISM, we establish a seven-level hierarchy for various contractor prequalification criteria, which are then grouped into four clusters based on their driving power and dependence power. The result of this study shows that ISM can be used to rank complex contractor prequalification criteria and help managers select a qualified contractor in the construction project bidding process during the strategic planning phase.
Funder
Ministry of Science and Technology, Taiwan
Chang Gung Memorial Hospital, Taiwan
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference47 articles.
1. Appraisal of subcontractor performance-criteria and their importance;Ng,2005
2. Improved Subcontractor Selection Employing Partnering Principles
3. Use questionnaire and AHP techniques to develop subcontractor selection system;Shiau,2002
4. Construction Tender Subcontract Selection using Case-based Reasoning
5. Criteria for contractor selection
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献