1. 1.Albert, M., “Installing a Computerized Shop Control System”,
Modern Machine Shop, June 1988, pp. 92‐101.
2. 2.Baker, K.R., Introduction to Sequencing and Scheduling, John Wiley
& Sons, New York, 1974.
3. 3.Grant, T.J., “Lessons for OR from AI: A Scheduling Case Study”,
Journal of the Operational Research Society, Vol. 37 No. 1, 1986, pp.
41‐57.
4. 4.McKay, K., Safayeni, F. and Buzacott, J., “Job Shop Scheduling Theory:
What Is Relevant?”, Interfaces, Vol. 18 No. 4, 1988, pp. 84‐90.
5. 5.Melnyk, S.A., Vickery, S.K. and Carter, P.L., “Scheduling, Sequencing,
and Despatching: Alternative Perspectives”, Production and Inventory
Management, Vol. 27 No. 2, 1986, pp. 58‐67.