Request for information frequency and their turnaround time in construction projects

Author:

Aibinu Ajibade A.,Carter Simon,Francis Valerie,Vaz-Serra Paulo

Abstract

Purpose The purpose of this paper is to study the nature of request for information (RFIs) on construction projects by using data analytics to understand the frequency of RFIs, when they occur on projects, and the relationship between project characteristics and frequency of RFIs and between project characteristics and RFI turnaround time. Design/methodology/approach A data-analytic approach using RStudio and Minitab software on 168 construction project cases in Australia and New Zealand involving 1,032,949 correspondences and 53,042 RFI event records made available by Aconex, one of the world largest cloud-based project management platform. Findings Large and complex projects tend to have significantly larger number of RFI events per day and longer RFI turnaround when compared with smaller and less complex projects. Projects with fewer users per organisation recorded a higher RFI turnaround time when compared with projects with more users per organisation – users mean persons involved in managing the project using the online platform (an index of project complexity). RFIs occur early on less complex projects and occur later on more complex projects. Research limitations/implications Benchmarks of RFI incidences and turnaround time have been developed for various project characteristics and, practitioners can use them to monitor the RFI performance of projects. Organisations need to pay greater attention to staffing levels needed to handle RFIs to reduce RFI turnaround time. Originality/value A data-analytic study of RFI yielded insights for managing RFIs. The findings of previous studies on RFIs are difficult to generalise because they are based on single project case study. The influence of project characteristics on RFI frequency and RFI turnaround time is not yet known.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference22 articles.

1. Aconex (2016), “Procedure example – request for information (RFI) – using mail”, available at: www.aconex.com/support/sites/aconex_support_central/files/article_files/acx-prd-001-en00_procedure_examplerfi-usingmail_201611.pdf (accessed 23 September 2017).

2. Necessary evils: controlling requests for information (RFIs) to reduce cost and improve margins;Construction Research and Innovation,2018

3. Organisational structures to support concurrent engineering in construction;Industrial Management & Data Systems,2002

4. The extent of team integration within construction projects;International Journal of Project Management,2006

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3