Author:
Huh Seung-Ha,Ham Namhyuk,Kim Ju-Hyung,Kim Jae-Jun
Funder
National Research Foundation of Korea
Ministry of Science, ICT and Future Planning
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference62 articles.
1. Economic analysis of design errors in BIM-based high-rise construction projects: case study of Haeundae L project;Ham;J. Constr. Eng. Manag.,2018
2. Dynamic control of construction supply chain to improve labor performance;Moon;J. Constr. Eng. Manag.,2015
3. Design error classification, causation, and prevention in construction engineering;Lopez;J. Perform. Constr. Facil.,2010
4. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors;Eastman,2011
5. Process-oriented approach of teaching building information modeling in construction management;Wang;J. Prof. Issues Eng. Educ. Pract.,2014
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献